R.E.S. – Power Generation (Photovoltaics – Small Hydropower Plants)
| Company / Organization | Location | Area / Project | Regional Unit | Capacity |
|---|---|---|---|---|
| Municipality of Orestiada | Ardas River | Kyprinos Dam | Evros | 5 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Municipality of Soufli | Large-scale photovoltaic park Part of a total investment with a capacity of 1.2 GW | Evros | 500 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Soufli | Development and design of 27 photovoltaic projects | Evros | 47.9 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Soufli | Development and design of 22 photovoltaic projects | Evros | 20.9 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Various locations | Northern Evros Development and participation in the construction of 60 photovoltaic parks | Evros | 6 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Thyrea | Energy community | Evros | 1 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Various locations | Northern Evros Development of 10 photovoltaic parks | Evros | 5 MW |
| K&K Solutions In collaboration with the Technical Office of Ilias Kyrizopoulos | Soufli | Development and design of 7 photovoltaic projects | Evros | 18.5 MW |
| AR Energy In collaboration with the Technical Office of Adamantios Papadopoulos | Various locations | Northern Evros Development of 8 photovoltaic parks | Evros | 3.2 MW |