Development of a large Photovoltaic Park 500Mw in Evros in the area of the municipality of Soufli which is part of a total investment of 1.2 Gw.
The development was done in…
Development and study for 27 projects from 1.3 to 2.4 Mw in the area of Soufli with a total capacity of 47.9 Mw. Growth date 2020.
The development was done in collaboration with the…
Development and participation in construction of 60 Photovoltaic Parks of 100 Kw, in the area of North Evros. Date of development: 2019. Status: built.
ENERGY COMMUNITY 1 Mw IN THE THYREA
The development was done in collaboration with the Technical Office of Elias Kyrizopoulos "K & K solusions".
Our office undertook the…
THYREA CURRENT ADJUSTMENT
Our office undertook the following tasks:
Topographic - elevation diagram dependent on a national grid of coordinates (EGSA ’87)Technical Report…
Development of 10 Photovoltaic Parks of 500 Kw, in the area of North Evros. Date of development: 2020. Status: Waiting for licensing.
The development was done in collaboration with…
Development and study for 7 projects from 1.8 to 6.2 Mw in the area of Soufli with a total capacity of 18.5 Mw. Growth date 2020.
Development of 6 Photovoltaic Parks with a capacity of 500 Kw and 2 parks with a capacity of 100 Kw, in the area of North Evros. Date of development: 2020. Status: Waiting for licensing.…